Framing of Roof - November 27th - December 3rd, 2016

The framing started on Wednesday, November 23rd; the day before thanksgiving.  By November 27th, awork was starting on the roof beams.  The ceilings are at at least 10’ high, including the garage.  The family room, entry way, and part of the study, have 12’ ceilings.  The roof has a fairly steep pitch and the top is around 25’ from the ground.